Construction on Cleve Hill’s main architectural feature -The North Wall is nearly complete. The concrete base and 2.4m stem for the wall was completed in August and the 7m high concrete panels were installed during September and October Most of the steel fins (31 of 37) have now been installed; the last 6 fins will be installed once the electrical commisiong works has been completed towards the end of the summer 2011.
The North Wall consists of 33 concrete panels and 37 aluminium fins placed in a 160m long line.